59 Views |
PTT Oil and Gas (Rayong) would like to construct for new green house to grow strawberry plant for working area 4,300 m2. Project period is Jun 2021 to Nov 2022 // Contract amount : 29,000,000 Baht
Our responsibilities are as following details.
1. Provide engineering and design including air conditioning and ventilation, chilled water piping, power distribution and motor control, automatic control and monitoring system , grounding system, climate controlling system, dosing for fertilizer and water and sanitary system
2. Provide calculation for all related design system
3. Provide JSA, method statement and execute project with safety management policy in laydown area
4. Supply and install new equipment for air conditioning system, chilled water pipes, electrical and automation system, climate controlling, dosing fertilizer and water and sanitary system .
5. Provide testing and test record for all equipment (insulation, function test, communication loop test and balancing tuning)
6. Provide final document and training