DP Next company (a group company of Banpu PLC) would like to renovate the existing factory to be new production process to assembly for solid state battery. The working area 1200 m2 and construct new power distribution & control system, lighting & receptacle system and fire alarm system, HVAC and ventilation system, compressed air system and Architect system.
Project period was Nov 2023 to Mar 2024. Our responsibilities were as following detail.
// Contract amount : 17,000,000 Baht.
1. Do conceptual and detail design for Architect system
2. Do engineering and design for HVAC and ventilation system, power distribution and control system, lighting and receptacle system
and fire alarm system for production process area.
3. Do engineering and design for air conditioning system, power distribution system, lighting and receptacle system and fire alarm
system for office and reception area.
4. Managed and executed projects and safety management.
5. Supply and install equipment for air conditioning system, electrical and automation equipment and programming.
6. Provide testing & inspection, testing and commissioning for all equipment and final document and training