PTT Oil and Gas (Rayong) would like to replace overhead MV lines and Disconnection Switch to underground installation. Project period is Jul 2021 to Dec 2021 // Contract amount : 4,360,000 Baht
Our responsibilities are as following details.
1. Provided shop drawing for underground installation routing and calculation for concrete duct bank and RMU' foundation
2. Provide JSA, method statement and execute project with safety management policy in hazardous area
3. Supplied and Installed RMU, MV cables, Duct bank, HDPE conduit , Riser Poles and HV termination
4. Provide testing for MV cable, RMU and Tie-in new installation equipment to existing system.
5. Provided final document