Gulf JP had built up for Power Plant in several provinces in Thailand during Year 2011 to Year 2015. We had joined with HAVC contractor to do for electrical system as following work detail.

Installation for Electrical System of HVAC System for Expansion of PTT LNG and HVAC System for Heavy Gas Plant of PTTGC // Contract amount : 6,800,000 Baht

Installation for Electrical System of HVAC System for GUT Power Plant, Uthaithani/ Nong Seang Combined Cycle Power Plant, Saraburi/ Khanom Power Plant, Nakornsrithamarat Period : During Sep 2014 to June 2015 // Contract amount : 12,800,000 Baht

  1. Engineering designed, supplied and installed  for LV MCC and LCS panel  for HVAC system.
  2. Designed and installed for LV cable raceway and panels.
  3. Test & commissioning and energize power for HVAC process.