CPP Fertilizer(Myanmar) would like to construct new chemical fertilizer plant including warehouse, production area, office area, road and pavement with working area 12,075m2 (35 rai). The factory location is at Tilawa’ industrial estate in Yangon city of Myanmar. Project period was Mar 2017 to Jun 2018. // Contract amount : 135,000,000 Baht
Our responsibilities were as following details.
- Provided shop drawing, method statement for installation civil & structure and architect, electrical system, air conditioning and ventilation system.
- Constructed for civil & structure and architect for warehouse, production area, office area, road and pavement.
- Constructed for water storage tank(concrete structure) for fire protection system.
- Supplied and installed for electrical power distribution system including HV(33kV), LV switchgear, transformer and motor control center cubicles for production process
- Supplied and installed for PLC and SCADA programming to control production process
- Supplied and installed for air conditioning and ventilation system for electrical control room and office area.
- Supplied and installed for facilities including lighting & receptacle system, lightning & grounding system, fire alarm, internet & telephone system.
- Tested & commissioning, provided final document and training.