76 Views |
The NSTDA would like to build up the pilot Biorefinery plant at EECi Wangchan Valley, Rayong. Project period is doing between 15 Mar 2021 to 30 Jan 2023 and contract amount : 3,000,000 Baht.
Our responsibilities are doing engineering and design for electrical system of production process of GMP and Non GMP foods product and building facilitiies as following system details.
1. For power distribution system (22 to 0.4kV)
2. For lighting and receptacle system
3. For lightning and grounding system
4. For security, access control and communication system
5. For emergency and permanent power supply